QUICK START GUIDEPage 1© 2021 ABB. All rights reserved.1U Stackable Distribution Shelf - 19 in RackMountJ2013001 - multiple models - See SPS, CP, or NE Brochure for models.Distribution shelves may be bused together as shown above in SPS, CP, and NE systems or used as stand-aloneremote distribution (cabled to a power system).Primary distribution shelves include battery connections. Some models also include battery contactors.Install the primary distribution shelf immediately above the primary SPS, CP, or NE rectifier shelf (with controller).Communication cables and interconnecting hardware are included.Refer to SPS, CP, or NE-S Power System Brochure for details and accessories.Tools required:Step 1 - Mount Shelf1. Reposition mounting ears as required - 4 screws each. Torque to 25 inlb (2.8Nm) - Phillips screwdriver.2. Position the Initial Panel immediately above the rectifier shelf withController. Position Supplementary Panels immediately above anotherPanel.3. Install Inter-Shelf brackets between adjacent shelves (optional). Torqueto 25 in-lb (2.8Nm) - Phillips screwdriver.4. Attach shelf to the frame using a minimum of four screws (two on eachside) - 12-24 (provided).Torque to 35 in-lb (4Nm) - 5/16” socket.SupplementaryDistribution ShelvesPrimary DistributionShelfBatteryConnectionoptionsSPS System Example• Torque wrench (0-65 in-lb or 0-10Nm)• Sockets - 5/16”, 7/16”• Screw Drivers (#1 Phillips)• Wire cutters and strippers• Cable crimpersInter-Shelf BracketMounting Ears2 Adjacent Shelves{Rectifier Shelves-