BASEPUMP RB750-EZ Installation Manual
Tools Required: Hand saw, screw driver, PVC cement, hole saw, tube cutter, and tape measureMount the Basepump Ejector on to the floor joist. Mount the Basepump against the face of the joist,underneath the floor joist, or on a wall. All mounting brackets and hardware included. Tools: Screw driver Materials Required: none Estimated install time: 20 MinutesMMount Basepump EjectorInstall the Suction Pipe by using PVC pipe. The Basepump location does not need to be directly overthe sump pit. It may be piped straight into the pit or with45 or 90 degree elbows if necessary. Tools: Saw, tape measure, and PVC cement Materials Required: EZ: 1” PVC White Pipe x 10 ft.: 45 deg. elbows PVC, if neededPRO: 1-1/4” PVC White Pipe x 10 ft.: 45 deg. elbows PVC, if needed Estimated install time: 20 MinutesIIInstall Suction PipeInstall the Discharge Pipe using either rigid PVC pipe or the supplied hose or both.Outdoor discharge: (shown) A separate discharge is recommended which will requiredrilling a hole through the fascia board to the outdoors. Tools: Saw, Hole Saw Size: EZ= 1-1/2”; PRO = 2” Materials Required: EZ: 1” PCV 90 deg. elbow,PRO: 1-1/4” PVC 90 deg. elbow Estimated install time: 60 MinutesIndoor discharge: Piped into the discharge line of the primarysump pump. Refer to instructions for this type of installation. Tools: Saw, tape measure Materials Required: 1-1/2” PVC TeeEZ: 1-1/2” x 1” PVC reducer fittingsPRO: 1-1/2” x 1-1/4” PVC reducer fitting Install Discharge Pipe |
This manual is suitable for:
manualsdatabase
Your AI-powered manual search engine