IM_04SERIES CRUX 1Safety warning – Do not climb on, rock,shake your rack. Only someone with goodmechanical skill and who has experienceshould install this rack. Never exceed themaximum load capacity. If you didn’tunderstood this instructions manualplease contact us by info@barpa.euATTENTION:please remove front/back door and sidepanel from the frame prior to unpacking.Remove side panel from frame, put them separate forthe preparation of the frame assembly;Fix 19” mounting rails to the first holes of top & bottomof side frames by 4sets of M5 screws;Install side frames to the grooves of back frame by 4pcsof M6*12 screws (6pcs if more than 18U) as shown by thearrow in the picture, note 19” mounting rails are in thefront side;Open the front door by key, pull the door latch downward,refer to the picture, remove the front door from frontframe, put them separate for the preparation of theframe assembly;8xM5x10bolt (<21U - 8pcs)xM6x12bolt(>12U - 20pcs)xM6x12 bolt(<12U - 10pcs)xM6x12 bolt(>21U - 12pcs)xM6x12bolt