Definox ICS CONTROL TOP Installation Manual
Also see for ICS: Maintenance notice
IT-TDFX-244 GB rev. 1 March 2010INSTALLATION GUIDEICS CONTROL TOPwww.definox.comDEFINOX SAS3 Rue de la Pépinière - Z.I. Nord44190 GETIGNE - France : +33 (0)2 28 03 98 50 : +33 (0)2 28 03 88 00E-mail: info@definox.com RecommendationIMPORTANTRefer to the maintenance notice (NM-245) when carryingout any repairs or modifications. Notice available on ourwebsite http://www.definox.com/AIR QUALITYDry air filtered at 10μmOperating pressure : 5 to 7 barsELECTRICALCompression gland PG9Terminal or multi-voltage module version:Conductor section: 0.5mm² recommended and 0.75mm²max.Cable dia. 4 to 8mm.AS-i version:Refer to the maintenance notice (NM-245). Disassembling the base from the topUnscrew the locking screw [E].Turn the connector [A] to unlock while holding the base torelease the mounting brackets. Hold the base and pull theconnector. Assembling the base on the actuatorScrew the detection cam [B] and NO or NC connection(according to the configuration).Position the base on the actuator, insert the two screws [F]and tighten (M8 tightening torque: 1N.m or 10Kgf.cm). Assembling connector onto the basePosition the control top on the base inserting the 3 mountingbrackets and respecting the action way of arrow [C] first, andthen arrow [D]. Tighten the screw [E] on the base.Locking and unlocking the housingLocked housing Unlocked housingWhen the housing is unlocked ; put it away.NOversionNCversionCDABASEBEEF |
This manual is suitable for:
manualsdatabase
Your AI-powered manual search engine