ASs 648To be handed to the workshop!Operating instructionsfor the double insulated and radio suppressedElectric Screw-Driver type ASs 648, ASs 648dand for ASs 748, ASs 748d (42 Volts)1. Technical DataType of current: ,....,Double insulation according to VDE 0740Radio suppressed according to VDE 0875I I II for iron screws for wood screwsISpeed R.P.M . IType I up to up toi in. I mm in. I mmI IASs 648/748 1/2 13 5/sASs 648 d/748 d 1/4 6 5/ 16II • I I I2. ConnectionMain voltage must correspond to the operation voltage markedon the rating plate. Switch in "Off" position.To prevent overbridging of the protecting insulation, no addi-tional marking plates and signs must be riveted or screwed. Werecommend the use of transfers .The screw-driver is provided with a reversing switch for clock-wise and anticlockwise rotation. It must not be operated whenthe machine is running.The machine is provided with a positive clutch. The torque isdependent on the pressure of the screw-driver against thescrew .3. Maintenance and LubricationBefore carrying out any maintenance work pull out plug.After 300 working hours clean air openings of the motor hous -ing. Blow out motor with dry pneumatic air . Renew the geargrease.Loosen screws (75, 76) and take off gear head. Only use the Feinspecial gear grease FG 12.After 900 working hours clean machine thoroughly. Rinse gearsin clean solvent and pack with fresh grease FG 12. Rinse ballBE 230/e X I. 68168I Input Output Net weight'Ifull load I no loadI WattsI Watts lbs I kgI I I I250 600 I 400 I220 7.6 3.4I950 2270I400 I 220 7.6 3.4III I IType of greaseIQuantity I OrderI Contentsoz. I g i Reference oz. I g~-~for gearsI 11 /s 6'ae-l MZ 60-3 /~ i 22 /s 80~for ball bear- 1/s b e tw ee n I MZ 60-2/ RH- 1 F /3 40I inner andings outer ringbearings in clean solvent and pack with fresh grease for ballbearings FK 3.Dismantling see paragraph 4.Clean electric parts only dry.Replace carbon brushes when they have worn down to 7 mm(0.28 in .). To replace brushes see paragraph 4, sections 1 and 3.Only use Fein carbon brushes.After fitting new brushes check that they move easily in theirholder. Run tool unloaded for about 15 minutes.Check connection cable at regular intervals. To replace unscrewscrews (20, 21). remove cover (19), loosen screws (16) of the ter-minal clamp and clamp off cable from switch (12).No claims can be entertained for damage due to negligent main-tenance and inadequate lubrication .Uee Un\voroal Gro::'lse type S:;t 1lt1 ~t~~cJ of otr1er types o f grease I