6. Integrated Pneumatic Backup Test:a. Verify pre-use assembly flowmeterset to 10 L/minb. Turn INOmax DSIR backup switch ONc. Verify measured valuesNO 14-26 ppmNO2 ≤< ≤ 1.0 ppmd. Turn backup switch OFF7. Performance Test:a. Verify O2 flowmeter is set to 10 L/minb. Set INOMAXdose to40 ppmc. Verifymonitoredvaluesd. Set INOMAX dose to 0 ppm• “Set Dose is Zero, Please Close Cylinder Valve”reminder will appear- DO NOT close cylinder valve atthis timee. Turn oxygen flowmeter OFF8. INOblender Test:a. Remove injector module from pre-use assemblyb. Remove O 2 tubing from flowmeter and attach toINOblender outletc. Set INOblender flow to 10 L/min, INOMAX dose to40 ppmd. Confirm acceptable NO valueNO 32-48 ppme. Set INOblender dose and flow to 0Pre-Use CheckoutWARNING: This reference card is not a substitute for the INOmax DS IR and INOblender Operationand Maintenance manuals. Refer to these manuals for all applicable cautions and warnings.Acceptable NO Value 35-45 ppmAcceptable NO 2 Value <1.5 ppmFiO2 95% ± 3%1. Turn device ON, low calibration will begin and complete2. Initial Connections:Confirm attachment of the following:a. Water separator cartridge, water trap bottle, andpatient gas sample line in placeb. Injector module cable and tubing are connectedc. Plug in power cord and verify AC power light is ONd. Regulator to 800 ppm INOMAX cylindere. Regulator hose to INOmax DS IR inletf. INOblender hose connected and white lock in placeg. Oxygen source (50 psig) to back of INOblenderh. IR cable in place3 . Assemble pre-use set-up connectors (diagram on backof card). Do not turn O 2 flowmeter ON yet.4. High Pressure Leak Test:Open/close INOMAX 800 ppm cylinder valvea. Verify, at least 500 psig cylinder pressureb. Verify, no decrease in cylinder pressure for30 seconds5. Manual Purge/Alarm Verification:a. Press CANCEL to exit pre-use wizard.b. Verify the INOMAX cylinder valve is closed.c. Set the O2 flowmeter to 10 L/mind. Purge INOmax DSIR.• Set the INOMAX dose to 40 ppm.• “Cylinder Valve Closed” alarm will occur.• Cylinder gauge pressure should drop to 0 psig.• Measured NO2 will increase and then decrease asNO2 is purged from the system.• “Low Cylinder Pressure” alarm will occur.e. Open the INOMAX cylinder valve.f. Turn the INOMAX dose to zero. The “Set Dose isZero, Close Cylinder Valve” indicator will appear.This indicator will display anytime the set doseis returned to zero; however, during this pre-useprocedure, leave the cylinder open and touch thescreen to reset the indicator.End of ProcedureIf device is not used within 10 minutes, depressurize cylinder regulator(The following instructions are provided for when the on-screen pre-use wizard is not used.)2e 2f2g2h2a8d8e8c8c8a8a8e8b6b6dSeries 3 software