15" Wide See Through Lockers – S-51000 SeriesSingle Tier Installation InstructionsPhone: 1-800-562-5377 Int’l Phone: 323-846-6700Fax: 1-800-562-5399 Int’l Fax: 323-846-6800www.lockers.com engineering@lockers.comInstallation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.Copyright © 2020 Salsbury Industries. All rights reserved. Page 1 of 5Thank you for selecting Salsbury’s 15" wide see through single tier lockers. These instructions are intended to assist you in assembling the lockers. Assembly of the various lockercomponents will be with #10 - 24 x 3/8” long slot less screws and #10 nuts (provided). Loosely fasten a screw and a nut into every set of mating holes with the screw heads positioned onthe outside of the locker or on the exposed surface.One Wide Locker AssemblyStep 1: Attach the top shelf, bottom shelf, and the first single coat hook to the backpanel.Step 2: Turn the back panel on its back with the shelves pointing upward. Attach thefirst side panel, the left rear leg, and the hat shelf to the assembly from Step 1. On15” deep lockers attach the double coat hook to the bottom of the hat shelf and attacha second single coat hook to the first side panel. On 18” deep lockers omit the doublecoat hook and substitute a single coat hook with a double bend (not shown) instead ofthe second single coat hook (this will accommodate the coat rod).Step 3: Attach the second side panel and the right rear leg to the assembly of Step 2.On 15” deep lockers attach a third single coat hook. On 18” deep lockers substitute asingle coat hook with a double bend for the third single coat hook and install the coatrod as shown on page 3. The locker chassis is now complete.Step 4: Attach the pre-assembled door frame onto the assembly of Step 3.Step 5: Tighten all fasteners checking for squareness of the locker while tightening.Attach optional sloping hood, end bases or front base (see pages 4 and 5).Step 6: Place the locker in the installed location and anchor to the floor, wall, or toboth. Individual job conditions will dictate the type of fastening anchors to use (notprovided).Step 7: Fasten all lockers in a row together by installing fasteners provided throughthe side panels. Installation is now complete.SALSBURY INDUSTRIES18300 Central Avenue, Carson, CA 90746-4008