Carrier 42XQ030 manuals
42XQ030
Table of contents
- Table Of Contents
- Introduction
- Receiving and Inspecting the Units
- Installation 4.1 - General Recommendations
- Installing the Indoor Units
- Interconnection Pipes 5.1 - Suspending and Mounting the Interconnection Pipes
- Adjusting the Gas Load
- Gap Between the Units
- Expansion System
- Electrical Box 42XQ
- Changing the Wireless Remote Control to a Wired Remote Control
- Electrical Diagram for Indoor Unit (220-240V output signal to compressor)
- Electrical Diagram for Indoor Unit (24V output signal to compressor)
- Configuring the Unit
- Configuring the Wireless Remote Control
- Configuring the Wired Remote Control (CRC)
- Function Test
- Selecting the Addresses of the Units
- Error Codes
- Initial Start-up
manualsdatabase
Your AI-powered manual search engine