Carrier 48HC28 manuals
48HC28
Table of contents
- SAFETY CONSIDERATIONS
- INSTALLATION
- Step 2 - - Plan for Sequence of Unit Installation
- Step 5 - - Field Fabricate Ductwork
- Positioning on Curb
- Step 9 - - Install Flue Hood and Combustion Air Hood
- Factory- - Option Thru- - Base Connections
- Step 11 - - Install External Condensate Trap and Line
- Units without Factory- - Installed Disconnect
- Units without Thru- - Base Connections
- Heat Anticipator Settings
- Humidi- - MiZer - - Space RH Controller
- PremierLinkt (Factory Option)
- Supply Air Temperature (SAT) Sensor
- Space Sensors
- Economizer Controls
- Space Relative Humidity Sensor or Humidistat Connections
- Smoke Detector/Fire Shutdown (FSD)
- CCN Communication Bus
- RTU Open Control System
- Outdoor Air Temperature (OAT) Sensor
manualsdatabase
Your AI-powered manual search engine