Carrier 50KC*A/B05 Series manuals
50KC*A/B05 Series
Table of contents
- AND DIMENSIONS
- KC*A/B05
- KC*A/B06
- INSTALLATION
- Step 3 — Inspect Unit
- Step 5 — Field Fabricate Ductwork
- Ductwork
- Step 8 — Install Outside Air Hood
- Step 9 — Units with Hinged Panels Only
- Step 11 —Make Electrical Connections
- FIELD POWER SUPPLY
- DISCONNECT
- FIELD CONTROL WIRING
- Electric Heaters
- Humidi-MiZer ® Control Connections
- Control and Power Wiring Diagrams
- Smoke Detectors
- Step 12 — Adjust Factory-Installed Options
- Evaporator Coil Metering Devices
Related products
50KC*A/B0 Series50KC*A/B06 Series50FC B05 Series50FC B04 Series50FC A05 Series50TC B07 Series50ES Series50CE Series50GL Series50FC SeriesCarrier categories
Air Conditioner
Heat Pump
Chiller
Furnace
Air Handlers
Fan
Thermostat
Heating System
Industrial Equipment
Electric Heater
manualsdatabase
Your AI-powered manual search engine