Manuals database logo
manualsdatabase
Your AI-powered manual search engine

Eaton 93E 30ITC manuals

93E 30ITC first page preview

93E 30ITC

Brand: Eaton | Category: UPS
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. list of figures
  5. list of tables
  6. INTRODUCTION
  7. Installation Features
  8. Figure 1-3. Eaton 93E 60 kVA UPS and Eaton 93E 60ITC
  9. Using This Manual
  10. For More Information
  11. SAFETY WARNINGS
  12. INSTALLATION PLAN AND UNPACKING
  13. Figure 3-1. 93E 30ITC Cabinet Dimensions (Front, Right Side, and Rear Views)
  14. Figure 3-2. 93E 30ITC Dimensions (Top and Bottom Views)
  15. Figure 3-3. 93E 30ITC Center of Gravity
  16. Figure 3-4. 93E 60ITC Cabinet Dimensions (Front, Right Side, and Rear Views)
  17. Figure 3-5. 93E 60ITC Dimensions (Top and Bottom Views)
  18. Figure 3-6. 93E 60ITC Center of Gravity
  19. ITC Power Wiring Preparation
  20. Inspecting and Unpacking the ITC
  21. Figure 3-7. Eaton 93E 30ITC and Eaton 93E 60ITC as Shipped on Pallet
  22. Transformer Breaker Location
  23. INSTALLATION
  24. Figure 4-1. Removing the Front Shipping Bracket – 93E 30ITC
  25. Figure 4-2. Removing the Rear Shipping Bracket – 93E 30ITC
  26. Figure 4-3. Installing the Pallet Extension Plate – 93E 30ITC
  27. Unloading the 60ITC
  28. Figure 4-4. Removing the Pallet Skids and Supports – 93E 60ITC
  29. Installing the Power Terminal Cover Base
  30. Figure 4-6. Eaton 93E 30ITC Power Terminal Cover Base Installation and Conduit Wire Entry Location
  31. Installing ITC External Power Wiring
  32. Figure 4-8. Wire Tray Location – 93E 30ITC
  33. Figure 4-9. Wire Tray Location – 93E 60ITC
  34. Figure 4-10. Input and Output Power Terminal Locations – 93E 30ITC
  35. Figure 4-11. Output Transformer Breaker Terminal Detail – 93E 30ITC
  36. Figure 4-13. Input and Output Power Terminal Locations – 93E 60ITC
  37. Figure 4-14. Output Transformer Breaker Terminal Detail – 93E 60ITC
  38. Figure 4-16. ITC and UPS Power Terminal Cover Base Wiring Channel
  39. Figure 4-17. ITC Power Terminal Cover Install
  40. Single-Feed UPS with Input and Output Transformers
  41. Dual-Feed UPS with Two Input Transformers
  42. Dual-Feed UPS with Two Input Transformers and One Output Transformer
  43. Initial Startup
  44. ONELINES AND SCHEMATICS
  45. Figure 5-2. Dual Transformer 93E 30ITC and 93E 60ITC Intercabinet Interconnection Oneline
  46. Schematics
  47. MAINTENANCE
  48. Recycling the ITC
  49. PRODUCT SPECIFICATIONS
  50. Environmental and Safety Specifications
Related products
93E-30/3093E 60ITC93E 30IAC-D93E-30/2093E93E-400/30093E-4093E-2093E-60/6093E XL
Eaton categories
More Eaton categories
Manuals database logo
manualsdatabase
Your AI-powered manual search engine