NCR RealPOS 70XRT 7403 manuals
RealPOS 70XRT 7403
Table of contents
- user guide
- safety requirements
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Introduction
- Optional Configurations
- Model and Serial Number Labels
- Features
- Motherboard
- Cabinet
- I/O Board
- Powered Serial Port Jumper Settings
- Removing the Display Head from the Base
- Integrated Customer Displays
- Remote Customer Displays
- Character Sets
- NCR 5975 Graphical VFD Customer Display
- Software Features
- Inch Color LCD
- Inch Touch Screen
- Power Supply
- Printers
- NCR 7168 Printer
- power management
- wake on lan
- chapter 2: installing the terminal
- installation summary
- connecting the external cables
- accessing the i/o panel
- accessing the backplane connectors
- cable routing
- backplane cable routing
- removing the storage media
- powering up the terminal
- connecting peripherals
- out-of-box failures
- installing the driver
- calibrating the touch screen
- verifying the calibration
- optional settings
- chapter 4: installing a secondary (dual) display
- single display mode setup
- dual display clone setup (notebook and monitor)
- extended desktop dual display setup (notebook and monitor)
- intel graphics controller hot keys
- configuring the 7403 terminal
- logging onto the 7403 terminal using amt
- removing the hard disks
- chapter 6: installing optional remote peripherals
- usb installation
- rs-232 installation w/power from powered usb
- installing a remote customer display
- ncr 5964 15-inch touch lcd cable connections
- ncr 5942 12.1-inch lcd monitor cable connections
- ncr 5942 15-inch lcd monitor cable connections
- ncr 5965 15-inch touch lcd cable connections
- installing an ncr 5975 remote customer display
- installing a cash drawer
- installing a second cash drawer
- chapter 7: installing a raid system
- replacing a failed raid 1 (mirrored) hdd
- raid option rom
- general specifications
- command codes
- clear display (12h)
- chapter 10: wedge to usb msr software migration
- software requirements
- deployment considerations
- chapter 11: maintenance
- cooling vent cleaning
- msr cleaning procedures
- chapter 12: operating system recovery
- connecting an external cd-rom drive
- os recovery procedures
- chapter 13: bios updating procedures
- creating the bootable media
- spi/bios updating procedures
- entering setup
- main menu
- pci/pnp menu
- boot menu
- chipset menu
- acpi bios
- irq settings
manualsdatabase
Your AI-powered manual search engine