H3C S5800-54S manuals
S5800-54S
Table of contents
- obtaining documentation
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Product overview
- Hardware compatibility matrix
- S5800-60C-PWR panel views
- Rear panel
- S5800-32C panel views
- S5800-32C-PWR panel views
- S5800-32F panel views
- Ports
- Base-T Ethernet port
- SFP+ port
- LEDs
- Power module LED
- Port mode LED
- Base-T Ethernet port LED
- Base-X SFP port LED
- Management Ethernet port LEDs
- Interface card status LED
- Hot swappable fan trays
- Interface cards
- OAP cards
- Preparing for installation
- Cleanness
- Installation tools
- Installing the switch
- Installing the switch in a 19-inch rack
- Mounting bracket and cable management bracket kits
- Rack mounting rail kit
- Attaching the mounting brackets to the switch chassis (for all S5800 switches except the S5800-54S)
- Rack-mounting the S5800-54S switch
- Rack-mounting an S5800 switch except the S5800-54S
- Mounting the switch on a workbench
- Grounding the switch
- Grounding the switch in other grounding environment
- Installing/Removing a fan tray
- Removing a fan tray
- Installing/Removing a power module (for the S5800-54S)
- Installing/Removing a power module (for the S5800-60C-PWR and the S5800-32F)
- Connecting the power cord
- Connecting the switch to a –54 VDC output RPS
- Connecting the PSR150-A/PSR150-A1
- Connecting the PSR150-D/PSR150-D1 to a –48 VDC power source
- Connecting the PSR150-D/PSR150-D1 to a –54 VDC output RPS
- Connecting the PSR300-12D1/PSR300-12D2 to a –48 VDC power source
- Connecting the PSR300-12D1/PSR300-12D2 to a –54 VDC output RPS
- Connecting the PSR750-D to a –54 VDC output RPS
- Connecting the LSVM1AC650/LSVM1AC300
- Connecting the LSVM1DC650/LSVM1DC300
- Installing an interface card
- Removing an interface card
- Removing the card in the OAP card slot (only for the S5800-60C-PWR)
- Installing an OAP card in an expansion interface card slot (for the entire series but the S5800-54S)
- Installing/Removing a PoE module
- Verifying the installation
- Powering on the switch for the first time
- Setting terminal parameters
- Powering on the switch
- Setting up an IRF fabric
- Planning IRF fabric setup
- Planning IRF topology and connections
- Identifying physical IRF ports on the member switches
- Planning the cabling scheme
- Configuring basic IRF settings
- Accessing the IRF fabric to verify the configuration
- Maintenance and troubleshooting
- Hot swappable power module failure
- OAP card failure
- Failure of the OAP card in an expansion interface card slot
- Fan failure
- Index
Related products
S5800-56CS5800-32CS5800-56C-PWRs5800 seriesS5800-60C-PWRH3C S5800-32FS5800-32C-PWRS5120V3-54S-EIS5120V3-54S-PWR-EIS5120V3-54P-EIH3C categories
Switch
Network Router
Network Hardware
IP Access Controllers
Firewall
Control Unit
Wireless Access Point
Server
Gateway
Wireless Router
manualsdatabase
Your AI-powered manual search engine