ADTRAN Total Access 3000 manuals
Total Access 3000
Table of contents
Total Access 3000
Table of contents
- total access 3000
- revision history
- Table Of Contents
- Table Of Contents
- Introduction
- Features and Benefits
- Equipment Chamber
- End Chamber
- Battery Chamber
- Cabinet Specifications
- Total Access 3000 Hi-Cap RT Solution Arrangement
- Table 3. Total Access 3000 Equipment-Side Cross-Connect Loop Wiring
- Installation
- Concrete Pad Location and Construction
- Polemount Installation
- Wiring Connections
- Power and Ground Cables
- DC Power Distribution
- Battery Installation
- Installing Data Cables
- Metallic Cable
- Power Turn-up
- Turnup and Test ECC
- Table 8. Alarm Block Terminations
- Customer Wiring
- Maintenance
- Warranty and Customer Service
Total Access 3000
Table of contents
- revision history
- Table Of Contents
- Table Of Contents
- General
- Compliance
- Installation
- Unpacking and Inspecting the Chassis
- Mounting Bracket Orientation
- Power Connections
- Figure 2. Total Access 3000 Backplane
- Test Frame Ground Connection
- Power Connection
- Figure 4. Total Access 3000 Rack Powering Diagram
- Apply Power and Check Voltage
- Data Connections
- Figure 5. Total Access 3000 Composite Clock Connections
- Connect BITS Clock
- MUX B Clock Output (B-OUT) - P20
- Connect DLT
- Wiring to MDF (TDM)
- Connecting the High-Speed Metallic Interface
- Alarm Connections
- Connecting Alarm Outputs
- Network Management Connections
- Figure 11. Total Access 3000 Interbank Connections
- Replacing Rear Plastic Guard
- Connecting the X.25
- SCU, Multiplexer, CSM, and Access Module Installation
- Specifications
- Warranty
Related products
Total Access 1500Total Access 850Total Access 1500 Chassis 1180001L1OPTI-3 WMCOPTI-6100 LMX1181001L1MX2820 M13 MUX1186001L11186002L21200375L1ADTRAN categories
Network Hardware
Network Router
Switch
Transceiver
Control Unit
Gateway
Multiplexer
Wireless Access Point
Network Card
Modem
manualsdatabase
Your AI-powered manual search engine