Booting the Switch 57Booting the SwitchChecking beforePower-OnBefore powering on the switch, verify that:■ The power cable and grounding cable are properly connected.■ The power supply voltage is consistent with that required by the switch.■ The console cable is properly connected; the terminal (which can be a PC) usedfor configuration has been started; and the configuration parameters havebeen set.Powering On the Switch The Switch 4800G have the same Boot ROM display style. This document uses theBoot ROM display of Switch 4800G 48-Port as an example:Starting......************************************************************ ** 3Com Switch 4800G 48-Port BOOTROM, Version 205 ** ************************************************************Copyright(c) 2004-2008 3Com Corporation.Creation date : May 28 2007, 15:36:08CPU Clock Speed : 533MHzBUS Clock Speed : 133MHzMemory Size : 256MBMac Address : 00e0fc005502Press Ctrl-B to enter Boot Menu... 0The last line asks whether you want to enter the Boot Menu. The system waits twoseconds for your response.n ■ The system has two startup modes: normal startup and fast startup. Thenormal startup mode takes a little longer time than the fast startup modebecause of more self-test operations.■ By default, the system starts up in fast mode and the waiting time here is twoseconds. If you set the startup mode to normal, the waiting time is fiveseconds. For the setting of the startup mode, refer to the next section.■ If you press Ctrl + B within two seconds, the Boot Menu is displayed:BOOT MENU1. Download application file to flash2. Select application file to boot3. Display all files in flash4. Delete file from flash5. Modify bootrom password6. Enter bootrom upgrade menu7. Skip current configuration file8. Set bootrom password recovery9. Set switch startup mode0. RebootEnter your choice(0-9):Table 15 describes the fields above.