50F1 Series Startup FormJob Name:_______________________________________________ Date:______________Address:____________________________________________________________________________________________________________________________________________________Model Number:_________________________________________________________________Serial Number:_____________________________________________ Tag:_______________Startup Contractor:______________________________________________________________Address:_____________________________________________________________________________________________________________________________ Phone:______________Pre Startup ChecklistInstalling contractor should verify the following items.1. Is there any visible shipping damage? Yes No2. Is the unit level? Yes No3. Are the unit clearances adequate for service and operation? Yes No4. Do all access doors open freely and are the handles operational? Yes No5. Have all shipping braces been removed? Yes No6. Have all electrical connections been tested for tightness? Yes No7. Does the electrical service correspond to the unit nameplate? Yes No8. On 208/230V units, has transformer tap been checked? Yes No9. Has overcurrent protection been installed to match the unit nameplaterequirement? Yes No10. Have all set screws on the fans been tightened? Yes No11. Do all fans rotate freely? Yes No12. Does the field water piping to the unit appear to be correct per designparameters? Yes No13. Is all copper tubing isolated so that it does not rub? Yes No14. Are air filters installed with proper orientation? Yes No15. Have condensate drain and p-trap been connected? Yes NoAmbient TemperatureAmbient Dry Bulb Temperature ________°F Ambient Wet Bulb Temperature ________°F