• When the shipment arrives, inspect the packaging for damage and contact AB SCIEX Customer Service or thelocal FSE to schedule the installation.• If available (or applicable), identify a qualified maintenance person (QMP) who is suitably aware of the electricaland chemical risks associated with servicing laboratory equipment. The FSE will review the QualifiedMaintenance Person Guide with this person during the installation.FSE Responsibilities• Review the checklist and discuss outstanding issues with the site planner.• Supply all fittings, plugs, and cables required to connect the mass spectrometer to the electrical receptaclesand regulators. Electrical receptacles must be within the maximum distances described in this document.• Assemble and set up any optional AB SCIEX benches ordered with the mass spectrometer.• Unpack and set up the mass spectrometer and acquisition computer.• Unpack and set up optional LC equipment sold and supported by AB SCIEX. Integrate other supported LCequipment.• Unpack and set up optional gas generator equipment sold by AB SCIEX.• Test and qualify the system to the specifications in the Installation Guide.During InstallationThe FSE unpacks the system (with assistance from people at your site), sets up the system, and then confirms itsoperation. When the system reaches proper vacuum, the FSE conducts system performance tests.Note: It takes several days for the FSE to set up the system and confirm operation.Operator FamiliarizationDuring installation, the FSE provides a system and software overview, reviews data, and provides some basicoperator familiarization. Training for auxiliary equipment supplied by other manufacturers is not provided by theFSE.Note: Online training is available at www.absciex.com/training.Site Planning GuideAB SCIEX 4000 Series of InstrumentsRUO-IDV-01-0563-A | D5040008 A6 of 33Customer and FSE Responsibilities