Installation Remove cover by releasing 2 off screws with a screwdriver. Wiring to overload: Connect leads provided from – terminal 14 to terminal 95 and terminal A2 to terminal 96 Check operating coil voltage and frequency Remove appropriate top/bottom knockouts. Attach conduit bushes to conduit Mount base and connect to bushes. If continuous grounding is required fit separate bonding strap. For on-site controlcircuit conversions see overleaf. Connect cables and ensure that all terminals are tight. When installed, set the hand/auto rest selector and adjust the current calibration to the desired value. Replace cover and re-tighten cover screws. Note: If an extra control device is required, see overleaf.Overload SelectionOrder referencesOverloadratingFull load AApproximate motor rating Recommendedmax. fuse size forshort circuitprotection A400V/3PHAC3230V/1PHMin. Max. kW hp kW hpTA25DU1.4 1.0 1.4 0.37 0.55 0.07 0.09 4TA25DU1.8 1.3 1.8 0.55 0.75 0.1 0.12510TA25DU2.4 1.7 2.4 0.75 1.0 0.18 0.25TA25DU3.1 2.2 3.1 1.1 1.5 0.25 0.33TA25DU4.0 2.8 4.0 1.5 2.0 0.37 0.520TA25DU6.5 4.5 6.5 2.2 3.0 0.55 0.75TA25DU11 7.5 11.0 4.0 5.5 1.1 1.535TA25DU14 10.0 14.0 5.5 7.5 1.5 2.0TA25DU19 13.0 19.0 7.5 10.0 2.2 3.0TA25DU25 18.0 25.0 11.0 15.0 3.0 4.080TA25DU32 22.0 32.0 15.0 20.0 4.0 5.5Note: This product is not suitable for d.c. applications.Terminal capacityMain AuxiliaryContactor 1 x 4mm2or2 x 2.5mm21 x 4mm2or2 x 2.5mm2Overload 1 x 10mm2or2 x 6mm22 x 2.5mm2SummaryA direct-on-line motor starter with ingress protection toIP66. Two-tone plastic enclosure with ABS lid and base.Trip class 10 requirements IEC 947-4-11.05 x FLC No tripping1.2 x FLC Trip within 2 hours1.5 x FLC Trip within 4 minutes7.2 x FLC Trip between 4s and 10sNOTE: FLC = Full load current1TVS013114P0300 Rev1 01/1DOL StarterPlastic Enclosure to IP65IEC947-4-1 Issue 1Installation InstructionsABB