1 sec100 2U UBase VTVTprim IECEQUATION16026 V1 EN-US (Equation 8)For phase-to-phase measurement:U UBase VTVTprim1100> × × secIECEQUATION2427 V1 EN-US (Equation 9)6. Decrease the phase voltage to a value lower than set U1> value.7. Observe that the START signal resets.8. Set and apply about 20% higher voltage than U1> value for one phase.9. Measure the operate time for TRIP Signal.10. Repeat the above described steps for Step 2 of the function.10.6.2.2 Completing the test M13806-43 v6continue to test another function or end the test by changing the TESTMODEsetting to Off. Restore connections and settings to their original values, if they werechanged for testing purposes.10.6.3 Two step residual overvoltage protection ROV2PTOV SEMOD54358-3 v7Prepare the IED for verification of settings outlined in Section "Preparing the IEDto verify settings".Values of the logical signals for ROV2PTOV are available on the local HMI underMain menu/Tests/Function status/Voltage protection/ResidualOverVoltage2Step(59N, 2(U0>))/ROV2PTOV(59N;2(U0>)):x, where x= 1, 2.The Signal Monitoring in PCM600 shows the same signals that are available on thelocal HMI.10.6.3.1 Verifying the settings SEMOD54358-35 v111. Apply a single-phase voltage either to a single-phase voltage input or to aresidual voltage input with the start value below the set value U1>.2. Slowly increase the value beyond the U1> setting until ST1 appears.3. Note the operate value and compare it with the set value U1>.4. Decrease the voltage slowly and note the reset value.5. Set and apply a 20% higher voltage than the measured operate value for onephase.6. Measure the time delay for the TR1 signal and compare it with the set valuet1.7. Repeat the test 1–6 above for Step 2 of the function.Section 10 1MRK 506 377-UEN CTesting functionality by secondary injection122 Railway application RER670 2.2 IECCommissioning manual