ABB T8 Installation Manual
Also see for Tmax T8: Operating instructions
Copyright © 2016 ABBAll rights reserved9AKK106930A0665 - Oct 2016 - Revision 11ABB Australia Pty LimitedPhone: 1300 666 595Fax: 1300 666 594E-mail: AU-ABB-Stanilite@abb.comwww.stanilite.com.auConstruction sitesContinuously switching of the mains power supply that is connected to emergency light fittings during the constructionphase of an installation will cause these fittings to discharge and charge their batteries many times over a short period;this can shorten the life of the battery and will also result in shortened emergency lamp life. ABB does not recommendsuch practices and may not honour the warranty on batteries when they are subjected to such harsh operatingconditions. Emergency light fittings are designed to be discharge tested once every 6 months as per AS/NZS2293.2,subjecting the product to repeated discharge or charge cycles is regarded as an abuse of the fittings.Trouble shooting guideIf you have installed and connected the unit as per the instructions listed earlier and it does not function correctly, use thefollowing table as a guide to fixing the problem. Look up the type of fault in the left column and check the possible causesfrom the right column.If the unit still does not work after checking these possible causes, contact ABB service in Australia on 1300 666 595,Monday to Friday, 7.00am to 5.00pm (AEST) and ask for help. Our trained service personnel will usually be able totake your call immediately and assist you in resolving your difficulty. ABB is committed to providing valuable through-lifesupport for its products.Doc no. 29-01039Power pack T8Nexus LXInstallation manualCongratulationsCongratulations on choosing to use this ABB product covered by our unique through-life support system. This documentis designed to assist you during the installation of this product; for the safety of yourself and others ABB recommendsthat you read this document thoroughly before commencing installation. The fittings are designed for easyinstallation. They are advanced pieces of electronic equipment which, when treated with care and maintained throughregular and appropriate servicing, will perform reliably for many years to come.Safety warningIn Australia and New Zealand, only licensed electricians are permitted by law to work with 240 volt electrical installations.Do not attempt to install or connect this product unless you are a licensed electrician.Turn off and isolate the electrical supply before connecting this fitting to the building wires.Do not touch the terminals of the terminal block when the light fitting is energised.The only user-serviceable part is the battery.Do not tamper with the fitting or the warranty will be void.As the installer, it is your responsibility to ensure compliance with all relevant building and safety codes, (ie: AS3000,AS/NZS2293). Refer to the applicable standards for data and mains cabling installation procedures and requirements.Important note: This product is designed for indoor use only.EMC warningPower pack complies with EMC regulations. We advise that if you incorporate this pack into your product (batten/fitting)you must test the complete (product/fitting) for EMC compliance.PL lamp warningFor PL lamp application it is recommended that the power pack be used without a LDR. The unit should be designatedas a non-maintained unit. The LDR is not designed to be affixed to a PL lamp. If AC lamp monitoring is required then theLDR must be mounted adjacent to the PL lamp. Please contact ABB support centre on 1300 666 595 if you require moreinformation. Specific PL lamp power packs are supplied without an LDR and are programmed as non-maintained.Nexus LX (data cable system)The Nexus® range of emergency light fitting are designed to be connected together into a special communication networkover a Level 4 (or higher) high speed, single twisted pair data cable. The Nexus user and technical guide describes allyou need to know to successfully install a Nexus project. Ask for it from your supervisor, from your employer or from yournearest ABB product supplier. The network cabling of the building must be installed as per the procedure detailed in theNexus user and technical guide. No mains or mains carrying cables are to be connected to the data terminals or cables.This document covers What’s inside the boxSafety warning Power pack T8 Nexus LXInstallation instructions Installation manualRemoval instructions Warranty informationTesting precautionsTrouble shooting guideNo. Fault Possible causes1 LED not lit; orLED not flashing greenAC supply not connected; orAC supply turned off2 LED is flashing green but AC lamp does not come on whenconnected to mainsSwitch active supply turned off; orMissing loop from unswitched to switched active; orLamp damaged; orLamp not inserted properly3 LED is flashing green but lamp does not come on when testswitch is pressedLamp damaged or lamp not inserted properly; orBattery pack not connected; orBattery pack damaged; orTest switch damaged4 LED not red after the commissioning Battery pack not connected; orLED wire not properly inserted into the terminal block5 Lamp is lit momentarily when test switch is pressed; orwhen mains failBattery not fully charged (allow up to 24 hours); orBattery pack damaged6 LED is constant green Unit self checks fail - return to manufacturer7 Unit LED is not flashing yellow/orange under wink node command Unit is not receiving communication signal. Check data cablewiring path and cable connections. Refer to Nexus user andtechnical guide. |
Related manuals for ABB Tmax T8
manualsdatabase
Your AI-powered manual search engine