Operation Manual / TPL65VA32/33Commissioning 3Inspection work 3.2 Page 38© Copyright 2015 ABB. All rights reserved.September 2015HZTL2464_ENRevision CInspection work3.2Inspection work includes preventive visual controls plus monitoring andmeasuring work before and during commissioning. Inspections help detectchanges to the turbocharger. Machine damage can be avoided.Inspection before commissioning Check for correct functioning. Inspect for damage. Check oil filter for cleanliness before commissioning.CAUTIONIt is urgently recommended that the entire lubricating system be flushedthoroughly with warm oil using a bypass pipe before starting up the firsttime (commissioning) and after all service work on the lubricatingsystem.It is urgently recommended that a running-in filter is used when runningin the engine and after all service work on the lubricating system. Check the oil pressure in the oil supply lines. Check that variable turbine geometry module can be adjusted.TPL65: Version with compressor wheel cooling system Check whether compressor wheel cooling system is fitted to bearingcasing.CAUTIONFailure of compressor wheel cooling systemThe service life of the compressor wheel will be impaired if thebreakdown of the compressor wheel cooling system lasts long. Ensure supply of cooling air.3.23.2.1Monitoring equipmentAir filter matLubricating systemTPL..VA