ABS Sanimat 1501S Installation And Operating Instructions Manual
14 ������������ ���� ���������� ������������ABS lifting station Sanimat5 C�mm����������m The safety hints in the previous sections must be observed!Before commissioning the unit should be checked and a functional test carried out. Particular attention shouldbe paid to the following:Have the electrical connections been carried out in accordance with regulations?Is the direction of rotation correct - even if run via an emergency generator?Was the control line (plastic hose) laid in such a manner that it has a continuous rise?Was the collection tank secured against floating?Has venting been installed in accordance with the regulations?ATTENTION Before commissioning the collection tank should be cleaned of any large particlesand filled with water. If the control line (plastic hose) was connected to thesubmerged tube with the tank already full, then the collection tank must be fullyemptied once by activation of the selector switch “Hand”. After commissioning thefaecal lifting station is normally operated with the selector switch in position “Auto”.6 M����������c Before commencing any maintenance work the unit should be completely disconnected from themains by a qualified person and care should be taken that it cannot be inadvertently switched back on.m When carrying out any repair or maintenance work, the safety regulations covering work in enclosedareas of sewage installations as well as good general technical pratices should be followed.NOTE The maintenance hints given here are not designed for “do-it-yourself” repairs asspecial technical knowledge is required.NOTE A maintenance contract with our works service department will guarantee you thebest technical service under all circumstances.6.1 C�mm�����y �� m���������� �f L�f����� S������� �� ����������� w��h EN 1056.It is recommended that the lifting station be inspected monthly and its function checked.In accordance with EN regulations, the lifting station should be maintained by a qualified person at the followingintervals:in commercial premises - every three months.in apartment blocks - every six months.in a single family home - once a year.In addition we recommend that a maintenance contract be taken out with a qualified company.--------- |
This manual is suitable for:
manualsdatabase
Your AI-powered manual search engine