English1-5Thermal InsulationWrap the Insulated pipe with thefinishing tape from bottom to topAir Discharge LouverAir Intake GrilleINSTALLATION DIAGRAMIndoor UnitOutdoor UnitAir IntakeAir IntakeTop PanelBottom PanelAir DischargeFigure APreliminary Site Survey• Voltage supply fluctuation must not exceed ±10% of therated voltage. Electricity supply lines must be independentof welding transformers which can cause high supplyfluctuation.• Ensure that the installation location is convenient forwiring and piping.Standard MountingEnsure that the overhead supports are strong enough to holdthe weight of the unit. Position the hanger rods (wall mountingbracket for floor standing), and check for its alignment withthe unit as shown in Figure A. Also, check that the hangersare secured and the base of the fan coil unit is leveled in bothhorizontal directions, taking into account the gradient fordrainage flow as recommended in Figure B.ABCH GE DFFigure B10mm or moreAll dimensions are in mmINSTALLATION OF THE INDOOR UNIT