INSTALLING THE SEHSEH USER’S GUIDE3-7To stack SEHs, refer to Figure 3-6 and perform the following steps:1. Attach one end of the SEH HubSTACK Interconnect cable to the busport labeled “OUT” on the rear panel of the SEH.2. Attach the other end of the SEH HubSTACK Interconnect cable to thebus port labeled “IN” on the rear panel of the SEH next in the stack.3. Attach up to four SEH hubs in the stack repeating steps 1 and 2.Figure 3-6. Stacking the SEHTo attach an SEH to an SEHI, refer to Figure 3-6 and follow these steps:1. Attach the SEHI HubSTACK Interconnect cable to the bus portlabeled “OUT” on the rear panel of the SEHI.2. Attach the other end of SEHI HubSTACK Interconnect cable to thebus port labeled “IN” on the rear panel of the SEH next in the stack.1491_06HubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTSEH INTERCONNECT OUTHubSTACK 10BASE-T HUB WITH LANVIEW®SEHI-24HubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECTHubSTACK 10BASE-T HUB WITH LANVIEW®SEH-24OUT INSEH INTERCONNECT