INDEX (cont)Refrigerant Float System, Inspect (ScheduledMaintenance), 78Refrigerant Leak Testing, 67Refrigerant Pressures, Reading, 63Refrigerant Properties, 67Refrigerant Tracer (Test After Service, Repair, orMajor Leak), 68Refrigerant Tracer, 46Refrigerant Transfer Procedures, Pumpout and, 63Refrigeration Cycle, 5Refrigeration Log, 63Relay (3C) (Optional), Hot Gas Bypass Contactor, 16Relay (4C), Oil Auxiliary, 16Relay Board, Six-Pack, 16Relay, Tower Fan, 36Relief Devices, Check, 50Relief Valves and Piping, Inspect (ScheduleMaintenance), 78Remote Start/Stop Controls, 36Remove Shipping Packaging, 45Removing Refrigerant, 67Repair, or Major Leak, Test After Service, 67Repair the Leak, Retest, and Apply StandingVacuum Test, 68Replacement Chiller Parts, Ordering, 83Replacement Parts, External Gear, 83Replacement Parts, Motor, 83Replacement, Transducer, 85Replacing Defective Processor Modules, 98Required, Equipment (Before Initial Start-Up), 45Required, Job Data (Before Initial Start-Up), 45Reset, Water/Brine, 37Resistance Check (Checking Temperature Sensors), 84Return Chiller to Normal Operating Conditions, 67Return to Non-Ice Build Operations (Ice Build Control), 41Rotation, Check Motor, 58Running System, Check the, 62S1, Control and Oil Heater Voltage Selector, 16Safety and Operating Controls, Check Monthly, 76Safety Considerations, 1Safety Controls, 33Safety Devices and Procedures (Instruct the Operator), 62Safety Inputs, Spare, 36Safety Shutdown, 45Schedule (OCCPC01S), Input the Local Occupied, 54Schedule, Occupancy, 32Schedule Maintenance, 76Scheduling, Holiday (Service Operation), 42Schematics, Physical Data and Wiring, 99Screen Freeze, Default, 33Seal Disassembly (Contact Seal Maintenance), 68Seal Reassembly (Contact Seal Maintenance), 70Sensor Installation, Common Point (Lead/Lag Control), 38Sensors, Checking Temperature (Troubleshooting Guide), 84Service Configurations, Input, 54Service Ontime, 76Service Operation, 22, 42Service, Repair, or Major Leak, Test After, 67Service Screen, To Access the (Service Operation), 42Set Points, Input the Design, 54Set Points, To View and Change, 22Set Up Chiller Control Configuration, 54Settings, Pumpout Safety Control, 83Shaft Seal Oil Control, 33Shipping Packaging, Remove, 45Short-Term Storage (External Gear Storage), 81Shunt Trip (Safety Controls), 33Shutdown,After Extended, 63After Limited, 63Extended, 63Safety, 45Shutdown Sequence, 44Six-Pack Relay Board, 16Sleeve Bearings (Motor Maintenance), 79SMM,Starter Management Module (Troubleshooting Guide), 97Starter Management Module, 16Soft Stop Amps Threshold, Automatic, 44Software Version, 54Solid-State Starters (Check Starter), 53Spare Alarm Contacts, 36Spare Safety Inputs, 36Specifications, Oil, 77Standing Vacuum Test, 49Start-Up,Before Initial, 45Initial, 57Local, 43Motor Initial, 58Prepare the Chiller for, 62To Prevent Accidental, 61Start-Up Checklist for 17EX Externally GearedCentrifugal Liquid Chiller, Initial, CL-1 to CL-12Start-Up/Recycle Operation (Ice Build Control), 40Start-Up Sequence, Dry Run to Test, 58Start-Up/Shutdown/Recycle Sequence, 43Start/Stop Controls, Remote, 36Starter Management Module (SMM) (TroubleshootingGuide), 97Starter Management Module (SMM), 16Starter,Check, 53Motor, 5Starters, 9Starters,Mechanical (Check Starter), 53Solid-State (Check Starter), 53Starting Equipment, Inspect the (ScheduledMaintenance), 83Starting the Chiller, 62Stopping the Chiller, 62Storage,External Gear, 81Motor, 81Structure, Menu, 17Surge Prevention Algorithm, 37Surge Protection, 38System Components, 5T1-T4, Control Transformers, 16Temperature Control During Ice Build (Ice BuildControl), 41Temperature Control,High Discharge, 35Oil Sump, 35Temperature Sensors,Checking (Troubleshooting Guide), 84Dual (Checking Temperature Sensors), 84Termination of Ice Build (Ice Build Control), 41Test After Service, Repair, or Major Leak, 67Test Start-Up Sequence, Dry Run to, 58119