CONTENTS33566889101212121313141414151515161616171718202121212122231. PREPARING FOR INSTALLATION ················································································1.1 Safety Percautions ·································································································1.2 Accessories ············································································································2. INDOOR UNIT INSTALLATION ·······················································································2.1 Installation Site Choosing ······················································································2.2 Install The Suspension Bolts ··················································································2.3 Handing The Indoor Unit ························································································2.4 Install The Drain Pipe ····························································································2.5 Install The Duct ·····································································································2.6 Change The Air Ventilation Direction ·····································································2.7 Install Fresh Air Duct ····························································································3. OUTDOOR UNIT INSTALLATION ················································································3.1 Installation Site Choosing ······················································································3.2 Outdoor Unit Mounting Dimension ·········································································3.3 Space Requirement For Outdoor Unit ····································································3.4 Install The Outdoor Unit ·······················································································3.5 Install The Drain Pipe For Outdoor Unit ·································································4. REFRIGERANT PIPING WORK ····················································································4.1 Flaring ·················································································································4.2 Piping Work ··········································································································4.3 Refrigerant Pipe ···································································································4.4 Air Evacuation ·····································································································4.5 Leakage Test ······································································································5. WIRING ·························································································································5.1 Power From Outdoor Side ·····················································································5.2 Independence Power Supply ·················································································5.3 External static pressure setting ·············································································6. MOTOR AND WATER PUMP DISASSEMBLE ····························································7. FINAL CHECK AND TRIAL OPERATION ·····································································7.1 Final Check List ·····································································································7.2 Manual Operation ··································································································7.3 Trial Operation ·······································································································8. INFORMATION SERVICING ······················································································7GB-2Caution: Risk of firefor R32/R290 refrigerant onlyGB