19START--UP CHECKLIST(REMOVE AND STORE IN JOB FILE)I. PRELIMINARY INFORMATIONModel No ............................................................................................................................................................Serial No .............................................................................................................................................................Date .....................................................................................................................................................................Technician ..........................................................................................................................................................Customer Information(Name/Address) .....................................................................................................................II. PRE--START--UP____ Verify that all packing materials have been removed from unit.____ Verify that condensate connection is installed per installation instructions.____ Check all electrical connections and terminals for tightness.____ Check wire proximity to refrigerant tubes and sheet metal edges.____ Check that indoor (indoor) air filter is clean and in place.____ Verify that unit installation is level.____ Check fan wheel propeller for location in housing and setscrew tightness.III. START--UPSupply Voltage: L1--L2 __________ L2--L3 __________ L3--L1 __________Compressor Amps: L1(C) __________ L2(S) __________ L3(R) __________Indoor Fan Amps: __________ Outdoor Fan Amps: __________TEMPERATURE--Cooling ModeOutdoor Air Temperature: __________ DB ____________WBReturn--Air Temperature: __________ DB __________ WBCooling Supply Air: __________DB___________WBPRESSURES--Cooling ModeRefrigerant Suction __________ psigSuction Line Temp* ___________Refrigerant Discharge __________ psigDischarge Temp{__________*Measured at suction inlet to compressor{Measured at liquid line leaving outdoor coil50ZP