127Chapter 9 Data CommunicationTo receive data from an SF/CSF/NX Series Unit1. After connecting the two units, turn on the PV Unit.2. Display the list view in a mode whose data can be received with thissetup.• This configuration supports receipt of Contacts, Memo, Schedule andTo Do data.• REMINDER 1, REMINDER 2, EXPENSE, CALENDAR, SKETCH,and FREE FILE data cannot be received.3. Tap the Menu Bar icon to display the menu bar, and then tap System –Data communication.4. Tap the button next to SF/CSF/NX.• At this time you could perform steps 5 through 7 under “To makecommunication parameter settings” above to make communication setup parameter settings if you want.5. Tap Set.6. Perform the required operations on the SF/CSF/NX Series Unit to senddata. See the manual that comes with the unit you are using for details.