22INSTALLATION OF EQUIPMENTThe installation of this equipment requires the necessity of specialized technical assistance(Alliage). Ask for the presence of a Alliage representative technician at the nearest seller,or through the Alliage Service Center: + 55 (16) 3512-1212.NoteThat information are also part of the Installation and Maintenance Manual of the equipmentthat is found with the Alliage authorized technical representative.INFRA-STRUCTURE SPECIFICATIONThe perfect functioning and the durability of the dental office are directly linked to the preinstallation,which must be carried out by duly trained professionals according to the instructions containedin the "Pre installation plan" which is found with the Alliage authorized technical representative.Turning on / off the dental setTurn on the main switch of the Dental Chair. All the functions of the equipment will be enabled. Themain switch has an internal LED which goes on when the dental chair is turned on.OPERATION OF EQUIPMENTUse of 3-Way SyringePress button (01) for water to come out, (02) for airto come out or both simultaneously to obtain a spray.Heating water activation*When triggering the switch key, the Led will go onindicating the syringe’s water heating. The temperatureshall remain around 40ºC. To turn the heating featureoff, position the key again.0102PositioningThe arm has horizontal and vertical movements, with a pneumatic locking device.Maintaining the button “Arm break valve” pressed, place the delivery unit in the desired positionholding it by the handle, and release it to fasten it in this position.Adjustment of Spray of TB/TM high and low rotation terminalsThe adjustment is made via a valve positioned in the terminal. Turn it in aclockwise direction to reduce the spray and in a counterclockwise directionto increase it.Note: As the “TB” double terminal does not have a spray this adjustment is notrequired.* Optional