English1This symbol stands for the itemswhich are forbidden.This symbol stands for the itemswhich must be followed.Thank you for purchasing this DAIKIN air conditioner. Before use, carefully read this owner’smanual and keep it in a safe place for future reference.The product in this manual may differ from the model you have purchased. Some models donot have a display. Please refer to the model you have for the correct position and shape ofthe display.This appliance should not be operated by people who have reduced physical, sensory ormental capabilities. People who have no experience using this air conditioner should readand understand the manual before operation, or be supervised by a knowledgeable person.Children should be supervised to ensure that they do not play with the appliance.Do not dispose of this product as unsorted municipal waste.Such waste must be collected separately for special treatment.OPERATION MANUAL■CONTENTS■ Safety Precautions......................................................................................2■ Introduction to basic functions ....................................................................4■ Description of parts .....................................................................................6■ Remote control operation............................................................................7■ Emergency operation............................................................................... 12■ Cleaning and maintenance ...................................................................... 13■ Troubleshooting ....................................................................................... 15INSTALLATION MANUAL■ Safety Precautions................................................................................... 18■ Installation dimensions............................................................................. 20■ Indoor unit installation .............................................................................. 21■ Outdoor unit installation ........................................................................... 23■ Installation and test operation checklist ................................................... 24