Figure 5. Wire schematic for non-fused disconnectapplication2. Reinstall bottom plate to disconnect box using (2)screws.3. Position disconnect kit assembly within subbase(Figure 2).4. Remove existing screw on inside of return airopening (Figure 2).5. Secure disconnect box to subbase using existingscrew from subbase and (1) screw from kit(Figure 2).Wiring the Cord Set1. Locate service and disconnect wiring in junctionbox. Disconnect ground, voltage and commonwires.2. Wire cord to terminals where voltage, common andground wires were previously located.Note:Use wiring schematic on unit for referenceFigure 3. Panel Fastener Locations5. To allow access to the interior of the subbase forinstallation of the fuse disconnect, disassemblethe unit by removing the appropriate fastener(numbered 1) shown in Figure 3, securing the rightor left side /corner panel to the subbase. Lift thepanel up and out until the bottom tab clears the slotin the subbase.Note: Set the unit panel aside where it will not bedamaged. Maintain all screws and fasteners for re-installation.Wiring1. Use wiring provided with disconnect kit andwire as shown in Figure 4, for a fused disconnectapplication. Refer to Figure 5 for non-fuseddisconnect application.Figure 4. Wire schematic for fused disconnect application©2013 Daikin Applied • www.DaikinAP.com • 800.432.1342 IM 975 / Page 2 of 2