5 CommissioningInstallation manual9RZQG71L9V1L + RZQG71~125L8Y1L + RZQG140L7Y1LSplit system air conditioners4P473073-1A – 2019.044 Choose a knockout hole and remove the knockout hole bytapping on the attachment points with a flat head screwdriverand a hammer.5 Route the wiring through the frame and connect the wiring tothe frame at the knockout hole.Routing throughthe frameChoose one of the 3 possibilities:ababab231a Power supply cableb Interconnection cableConnecting to theframeWhen cables are routed from the unit, aprotection sleeve for the conduits (PGinsertions) can be inserted at the knockouthole.When you do not use a wire conduit,protect the wires with vinyl tubes toprevent the edge of the knockout hole fromcutting the wires.a b c d eA BA Inside of the outdoor unitB Outside of the outdoor unita Wireb Bushc Nutd Framee Hose6 Reattach the service cover.7 Connect an earth leakage circuit breaker and fuse to the powersupply line.4.6 Finishing the outdoor unitinstallation4.6.1 To finish the outdoor unit installation1 Insulate and fix the refrigerant piping and interconnection cableas follows:fbaedca Gas pipeb Gas pipe insulationc Interconnection cabled Liquid pipee Liquid pipe insulationf Finishing tape2 Install the service cover.4.6.2 To check the insulation resistance of thecompressorNOTICEIf, after installation, refrigerant accumulates in thecompressor, the insulation resistance over the poles candrop, but if it is at least 1 MΩ, then the unit will not breakdown.▪ Use a 500 V mega-tester when measuring insulation.▪ Do not use a mega-tester for low-voltage circuits.1 Measure the insulation resistance over the poles.If Then≥1 MΩ Insulation resistance is OK. This procedureis finished.<1 MΩ Insulation resistance is not OK. Go to thenext step.2 Turn ON the power and leave it on for 6 hours.Result: The compressor will heat up and evaporate anyrefrigerant in the compressor.3 Measure the insulation resistance again.5 CommissioningNOTICENEVER operate the unit without thermistors and/orpressure sensors/switches. Burning of the compressormight result.5.1 Checklist before commissioningAfter the installation of the unit, first check the following items. Onceall below checks are fulfilled, the unit MUST be closed, ONLY thencan the unit be powered up.You read the complete installation instructions, asdescribed in the installer reference guide.The indoor units are properly mounted.In case a wireless user interface is used: The indoor unitdecoration panel with infrared receiver is installed.The outdoor unit is properly mounted.