www.DaikinApplied.com 19 IOM 1210-1 • MAGNITUDE® MODEL WMC CHILLERSInsTallaTIonPre-Start ChecklistPre-Start Checklist – Centrifugal ChillersMust be completed, signed and returned to Daikin Applied service dept. at least 2 weeks prior to requested start date.Job NameInstallation LocationCustomer Order NumberModel Number(s)G.O. Number(s)Chilled Water Yes No N/A InitialsPiping CompleteWater System – flushed, filled, vented; Water treatment in placePumps installed and operational (rotation checked, strainers installed and cleaned)Controls operational (3-way valves, face/bypass dampers, bypass valves, etc.)Water system operated and tested; flow meets unit design requirementsCondenser Water Yes No N/A InitialsCooling tower flushed, filled, vented; Water treatment in placePumps installed and operational (rotation checked, strainers installed and cleaned)Controls (3-way valves, bypass valves, etc.) operable per IM/IOMWater system operated and flow balance to meet unit design requirementsElectrical Yes No N/A Initials115 volt service completed, but not connected to control panel (remote mounted starters)Line Power Leads connected to starter; load leads(b) run from starter to compressor, ready forconnection by Service (Do not connect load leads to starter or compressor terminals). (See Notes 1 & 4)All interlock wiring complete and compliant with Daikin Applied specificationsStarter complies with Daikin Applied specifications*Oil cooler solenoid wired to control panel as shown on wiring diagram (See Notes)Pump starter and interlocks wiredCooling tower fans and controls wiredWiring complies with National Electrical Code and local codes (See Note 4)Condenser pump starting relay (CP1,2) installed and wired (See Note 3)Miscellaneous Yes No N/A Initials*Oil cooled water piping complete. (Units with water-cooled oil coolers only)Relief valve piping complete (per local codes)Thermometers, wells, gauges, control, etc., installedMinimum system load of 80% capacity available for testing/adjusting controlsDocument Attached: Technical Breakdown from Daikin ToolsDocument Attached: Final Order AcknowledgementNotes: The most common problems delaying start-up and affecting unit reliability are:1. Field installed compressor motor power supply leads too small. Questions: Contact the local Daikin Applied sales representative. State size, number and type ofconductors and conduits installed:a. From Power supply to starterb. From starter to chiller unit (remote mounted)2. Centrifugal chillers with water cooled oil coolers must have a 115 volt normally closed water solenoid valve installed in the oil cooler water supply line. DaikinApplied recommends ASCO Type 8210B27 solenoid valve or approved equal and 40-mesh strainer. Daikin Applied does not supply these components.3. A 115-volt field-supplied relay (CP1,2) must be used to start/stop condenser water pump on most applications. Cold condenser water must not flow throughcondenser during compressor off cycle. Provisions have been made in control center for connecting CP relay, but must not have a rating in excess of 100 VA.4. Refer to NEC Article 430-22 (a) *Does Not Apply to Magnetic Bearing Chillers (WMC/WME)Contractor RepresentativeSigned:Name:Company:Date:Phone/Email:Daikin Applied Sales RepresentativeSigned:Name:Company:Date:Phone/Email:©2014 Daikin Applied Form SF01017 05AUG2014