A Principled Technologies setup guide 6A quick and easy guide to setting up the Dell PowerEdge C8000Installing power cablesThe steps below assume you have power distribution units (PDU) and rack-mounted network switches installed in the rack according to the includeddocumentation. This document does not include installation instructions for theseitems, as instructions can vary depending on the type you are installing. Note: DistributeC8000 power across two power circuits for redundancy.1. Plug power cables from one side of C8000 chassis into one AC power source andthe other side into a second AC power source. Be sure to run the power cablesdown the side of server rack to ensure the cables do not block fans and limitairflow.2. Keep the power cables away from Ethernet cables.3. Do not bend cables more than necessary during installation.4. Do not place extra lengths of cable in front of cooling intake or exhaust ports.5. Avoid mounting cables and cabling components in locations that block access toother equipment within the rack.6. We recommend labeling power cables for quick identification in the future.7. If the rack is not full, we recommend allowing space for future cabling.Figure 4: PDU installation.