14 PowerEdge FX2 - Upgrading from 10GbE Pass-through Modules to FN410S I/O Modules | version 1.03.2.3 Part 3 – Replace the PTM in Slot A2 with an FN410S1. Disconnect all cables from the PTM in slot A2 (PTM-A2).2. Remove PTM-A2 from the chassis. All server CNA ports connected to PTM-A2 go down. FN410S-A1 is not affected and functions normally.3. Insert an FN410S into slot A2 (FN410S-A2). FN410S-A2 powers up and takes about 2 minutes to boot. After FN410S-A2 has booted, the server CNA ports will continue to be down until the next step due tothe UFD feature.4. Connect cables from S4048-ON ports te 1/7-1/8 to FN410S-A2 ports te 0/9-0/10. The network nowappears as shown in Figure 10. After the connection is made, the LACP port channel between FN410S-A2 and the S4048-ON comesup. On FN410S-A2, UFD detects port channel 128 is up and brings up the internal, server-facing ports(FN410S-A2 ports te 0/1 and te 0/5 in Figure 10). This causes the corresponding server CNA ports tocome up.S4048-ONFX2 ChassisUpstreamServerFC630Slot 3CNA port 110.0.0.1FC630Slot 1CNA port 110.0.0.3CNA port 2192.168.1.1CNA port 2192.168.1.3te 0/9te 0/9te 0/10te 0/10 te 1/5te 1/6te 1/7te 1/8te 1/9te 1/10port 110.0.0.6port 2192.168.1.6te 0/1te 0/1te 0/5te 0/5ToRSwitchPo 128FN410S-A1FN410S-A2Po 10Po 128Po 11 default VL ANVL AN 6Step-by-Step Example: After UpgradeBoth FN410S IOMs installed5. After the FC630 server's CNA ports are up, a north-south connectivity check is done by pinging theservers in the FX2 chassis from an upstream device on all applicable VLANs traversing FN410S-A2.The upstream server at 192.168.1.6 successfully pings the FX2 servers at 192.168.1.1 and 192.168.1.3through the ToR and FN410S-A2 on VLAN 6.