Contents1.0 Foul V3 Overview 42.0 Parts Included 42.1 Optional Extras 43.0 Discharge Pipework & Fittings 54.0 Chamber Overview 65.0 Spare Parts 66.0 Technical Information 77.0 Pump Chamber Depth Limits 88.0 Installation Guidelines 99.0 Pump Station Location 910.0 RC Box Dimensions 911.0 Installation of Chamber 10Section A - Construction of reinforced concrete box 10Section B - Connecting 110mm inlet pipework 11Section C - Connecting discharge, cable duct and vent 12Section D1 - Backfill around chamber with concrete (RC Box) 14Section D2 - Backfill around chamber with concrete (Ground) 15Section D3 - Backfill around chamber with concrete (Reinforced cage) 16Section E - Preparing chamber for installation of pump 17Section F - Fitting discharge to pump 18Section G - Installing pump and high level alarm in chamber 1912.0 Wiring Diagram (inc. AlertMaxx2) 2112.0 Wiring Diagram (inc. AlertMaxx2 & Hi-PowerMaxx) 2213.0 Maintenance 2314.0 Health and Safety 2315.0 Guarantee 2316.0 Troubleshooting 24Delta Foul V33