16DVD-3930/3930CI3. Installing Loader(1) Inserting LoaderSet and push the Loader to the arrow direction until it stops.When installing the Loader, move Plate Gear to right before-hand so as that the boss of the Plate Gear fits in the backsidegroove of the Loader. (See figure right)(2) Fixing LoaderFix the Loader with each 2 screws (c) and (d).4. Assembly (1)(1) Assembling Main P.W.B. Ass’yFix the Main P.W.B. Ass’y with 3 pcs of 3mm P-tight screw (e).(2) Removing Pickup-short SolderAfter connecting 24P-FFC of the Pickup with P.W.B., removesolder from 1 shorted positions.(3) Temporary Positioning Clamp BaseTo protect your eyes from laser light, put the Clamp Base tem-porarily.(4) Positioning up Traverse UnitConnect the following wires of the Mechanism Unit, and operateit.• CY132: 13P-PH wire for power• CX212: 21P-FFC wire from Display P.W.B.Turn on the power to the unit, and press “OPEN/CLOSE” buttonto close the Loader.The Traverse Unit rises up. (display: 0h00m00s)Pull out Loader forward, and life up to take it out.(d)(c)Plate GearGroove BossBearing PlateLoader(e)(e)(e)Clamp BaseMain P.W.B. Ass’y(d)(c)(e)(e)(e)