111906-01EFor more information, visit www.desatech.comFor more information, visit www.desatech.com1717Figure 26 - Attaching Speed Control to FireboxSpeed ControlControlShaftLocknutControlKnobSwitchBracket BlowerPlug-InFIREPLACE INSTALLATIONInstalling Optional Blower AccessoriesDuplex Outlet(Located underneathfirebox floor againstlower right outside wall)FIREPLACE INSTALLATIONContinuedVariableFan SwitchWhiteWhiteBlackGreenOn110/115V.A.C.BlowerMotorBlackBlackBlackOffFigure 27 - Location of Wiring Diagram Decal (Model May VaryFrom Illustration)Wiring Diagram Decal12" in Front of BlowerModel BKT InstallationNote: When installing the BKT thermostatically-controlled blower,you must first secure the thermal switch bracket to the blower if ithas not already been factory installed.1. Place the green ground wire with ring terminal between thebottom hole on the thermal switch bracket and the top ear holeon the blower assembly. Insert the phillips screw into all threepieces and tighten securely (see Figure 28).2. Connect wire harness and power cord terminals. Connect theblue jumper wire to the blower motor terminal and the rightside terminal of the thermal switch. Connect the black wire tothe left side of the thermal switch and the white wire to theother remaining blower motor terminal.Note: The power cord outer insulation sleeve may have to bestripped slightly to allow enough wire length to reach and make allconnections. DO NOT trim excessive length away. Just enableenough to make all connections securely.3. Place the blower against the lower rear wall of the firebox outerwrapper with the exhaust port directed upward and the thermodiscpositioned up near the fireplace bottom. The thermodisc must beoriented near the fireplace bottom as shown in Figure 28 in orderto sense temperature and properly operate. The blower will beheld in position against the back wall by the magnets incorpo-rated onto the blower housing (see Figure 28).4. Be certain that all wire terminals are securely attached to ter-minals on blower motor and thermal switch, and that the screwfor the thermodisc bracket and green ground wire is tight.5. Mount the speed control box against the mounting plate pro-vided in the lower fireplace cavity by placing the plastic controlshaft forward through the round hole (see Figure 26).6. While supporting speed control, secure control shaft with locknut by pushing and turning lock nut with pliers clockwise un-til it is tight against mounting plate. Place control knob pro-vided on shaft (see Figure 26).7. Check to make sure that the power cord is completely clear of theblower wheel and that there are no other foreign objects in blowerwheel. Also double check all wire leads and make sure wire rout-ing is not pinched or in a precarious position. Correct accordingly.8. Turn on power to duplex outlet if previously turned off per thewarning in column 1, page 16.9. Plug in blower power cord to duplex outlet.10. The blower will only run when the speed control knob is in theON position and the thermal switch senses temperature after thefireplace begins to heat up. The blower speed can be adjusted byrotating the control knob. To turn off, turn knob fully counter-clockwise until it clicks off. If the blower is ON and has beenrunning with the fireplace operating, the blower will continue torun for a short time after the fireplace has been turned off. As thethermal switch cools down, the blower shuts down automatically.11. Peel off the backing paper and stick the supplied wiring dia-gram decal on the firebox bottom approximately 12" in frontof the blower (see Figure 27).ThermodiscFigure 28 - Blower Model BKTAir Flow DirectionRoute BKTBlower ThroughThis AreaMagnetsBlowerLocationSide View Firebox BottomBlackWirePhillipsScrewBlue WireRing Terminalon Green WireWhite WireThermal SwitchThermalSwitchBracketPower CordAir FlowDirectionMagneticStrips