111115-01A14For more information, visit www.desatech.comFor more information, visit www.desatech.comOPERATING HEATERFOR YOUR SAFETY READBEFORE LIGHTINGWARNING: If you do not follow these instructionsexactly, a fire or explosion may result causing prop-erty damage, personal injury or loss of life.A. This appliance has a pilot which must be lighted by hand.When lighting the pilot, follow these instructions exactly.B. BEFORE LIGHTING smell all around the appliance areafor gas. Be sure to smell next to the floor because some gasis heavier than air and will settle on the floor.WHAT TO DO IF YOU SMELL GAS• Do not try to light any appliance.• Do not touch any electric switch; do not use any phonein your building.• Immediately call your gas supplier from a neighbor’sphone. Follow the gas supplier’s instructions.• If you cannot reach your gas supplier, call the firedepartment.C. Use only your hand to push in or turn the gas control knob.Never use tools. If the knob will not push in or turn byhand, don’t try to repair it, call a qualified service techni-cian or gas supplier. Force or attempted repair may resultin a fire or explosion.D. Do not use this appliance if any part has been under water.Immediately call a qualified service technician to inspectthe appliance and to replace any part of the control systemand any gas control which has been under water.INSTALLATIONContinuedFigure 24 - Installing Log set (Top View)LogsBurnerPortsOFFPILOTONHILOOFFPILOTONHILOOFFPILOTONHILOOFFPILOTONHILOFigure 25 - Installing Left TopLogs (#2 and #3)Figure 26 - Installing RightTop Logs (#4 and #5)Left Rear Log(#2)Right RearLog (#4)Right FrontLog (#5)INSTALLATIONInstalling Logs (Cont.)OPERATIONFor Your Safety Read Before LightingLeft FrontLog (#3)2. Facing front of unit, place left rear log (#2) onto the two pinson left rear of base log (see Figure 25).3. Position left front log (#3) onto two pins on left front and middleof base log (see Figure 25).4. Place right rear log (#4) onto two pins on right rear of base log(see Figure 26).5. Place right front log onto two pins on right front of base log(see Figure 26).6. Place control cover log onto two pins in front right section ofbase log. Be sure control cover log seats well into cutout sec-tion of base log.7. Place lava rock around base of heater.Figure 27 - Control Cover Log (#6) PlacementOFFPILOTONHILOOFFPILOTONHILOControl CoverLog (#6)