1. If not already accomplished, use a forklift or pallet jack to move the UPS cabinet to theinstallation area, or as close as possible, before unloading from the pallet. Insert the forklift orpallet jack forks between the supports on the bottom of the pallet (see Figure 3-4 for the UPScabinet center of gravity measurements).2. Attach the ramp to the front of the pallet3. Remove four bolts securing the front shipping bracket to the cabinet and four bolts securingthe bracket to the pallet (see Figure 4-1). If installing the cabinet permanently, retain theshipping bracket and securing hardware for later use.4. If the leveling feet are not fully retracted, turn the leveling feet until they are retracted.5. Remove four bolts securing the rear shipping bracket to the cabinet and four bolts securingthe bracket to the pallet (see Figure 4-1). If installing the cabinet permanently, retain theshipping bracket and securing hardware for later use.WARNINGDo not stand directly in front of the pallet while unloading the cabinet. If unloading instructions arenot closely followed, the cabinet may cause serious injury.6. Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down theramp until the cabinet is clear of the ramp (see Figure 4-3).7. Roll the cabinet to the final installation location.8. If installing the cabinet permanently, retain the shipping brackets and hardware; otherwise,recycle the pallet, ramp, and shipping brackets in a responsible manner.9. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet is notresting on the casters and the cabinet is level.10. If permanently mounting the system, proceed to Step 11;11. Using the retained hardware, reinstall the shipping brackets removed in Step 2 and Step 5 tothe front and rear of the UPS cabinet with the angle facing outward (see Figure 4-1).12. Secure the cabinet to the floor with customer-supplied hardware.22Eaton 93E MK2 UPS (10-40kVA, 380/400/415V) Installation and Operation