4MountingEG2-NA Ethernet Gateway www.eaton.comMountingLocation and spacingThe EG2-NA should be installed in a dry ventilated location,where ambient conditions are maintained within therequirements of the unitThe unit has ventilation slots on the sides to allowconvection cooling and in no circumstances should these beblockedAllow 2” (50mm) above and below the unit if trunking witha depth greater than 2” (50mm) is usedAmbient atmosphere requirements●● Temperature: 32°F to 104°F (0°C to +40°C)●● Humidity: 20% to 90%, non-condensingMounting HolesThe unit is provided with four 0 25” (6 35mm) diameterfixing holes for wall mounting The mounting holes can beaccessed by undoing the four screws on the front cover andremoving itSupply WiringConnecting the SupplyThis unit requires a 120-240 VAC single phase supply (liveand neutral) with 0 45 A capabilityA terminal block is used to connect the incoming feed tothe internal power supplyControl WiringiCAN NetworkA removable 5 position terminal block is provided for theconnection of iCAN network cables If the EG2-NA islocated in the middle of the network, incoming and outgoingcables will terminate within the same connectorTermination OFFTermination ON+12V(Red)CAN-H(White)SHIELD(Gray)CAN-L(Blue)0V(Black)Wire Gauge for Supply TerminalsThe live, neutral and earth ground power connectionsare made to the terminal block provided for main powerconnection Recommended cable size for live, neutral, andearth is 26 AWG - 10 AWGLive (Gray)Neutral (Blue)Earth (Green/Yellow)Live (Gray)Neutral (Blue)Earth (Green/Yellow)