INSTALLATIONEaton Rack Power Module (24–96A: 208Y/120V, 400Y/230V) User's Guide 164201675 Rev 2www.eaton.com/powerquality28Advanced Metering Installation (Optional)NOTE Follow these instructions only if you ordered the Advanced Metering option.The Power Xpert Gateway Series 1000 Card (shown in Figure 9) isfactory-installed in the X-Slot® communication bay on the front of theRPM-3U/3Ui. See Figure 11 on page 30 for the location of thecommunication bay.To connect the cables and configure the card:1. Locate the Power Xpert Gateway Series 1000 Card Quick StartInstructions included with the RPM-3U/3Ui.2. Perform all the steps in the quick start instructions, ignoring theinitial few steps that describe how to install the card in a PDU.The quick start instructions direct you to: Connect the Ethernet cable Connect the configuration (serial) cable Configure IP Address assignments3. For more detailed information about installing the card or usingAdvanced Metering, download the Power Xpert Gateway Series1000 Card user's guide from the Documentation page on the PowerXpert card once the card is accessible on your network or fromwww.eaton.com/powerxpert.EthernetPort 2EthernetPort 1Configuration(Serial) PortFigure 9. Power Xpert Gateway Series 1000 Card