65A7320H0121 of 41Step 15:The wires should be secured in this manner and any excess cableties should be clipped.Figure 15a (left): Use three zip ties to secure the unused wires to theinner wall.Figure 15b (right): Wires are secured from both the closing and openspring assemblies.In Process Quality Check: Operate the breaker mechanically and make sureno moving parts interfere with the wiring.(3)ZipTies