Centerline8" Min. AboveTop MountingBracket Holes6-1/4"Centerline To WallFOR WALL VENT DUCTFOR CEILINGVENT DUCTINGCL124Dia148-1/2" Dia. HoleCLCLCLInstallation Preparation8DUCTWORK, WIRING LOCATIONSDetermine the exact location of the vent hood.• Locate the template packed with the literature.– Measure 36" from the floor to the top of the cookingsurface. Add 25-1/2" (or other recommended space)from the cooking surface to the bottom of the hood.Mark that location.– Use a level to draw a straight pencil line on the wall.CHECK INSTALLATION HARDWARELocate the hardware accessory box packed with thehood and check contents.124Dia10124Dia8124Dia9124Dia5124Dia7124Dia132 LargeFlat Washers3 Phillips HeadDecorative Screws3 Stainless Steel Grease Filters8 WoodScrewsWall Mount Template2 Mounting BracketsDuct Cover Bracket4 WallFasteners2-pieceDecorative Duct Cover(dimension shownfor reference only)– Tape the template in position along the penciledline. CHECK TO BE SURE THE TEMPLATE ISLEVEL.Ceiling ducting:If ductwork will vent straight up to the ceiling:• Use a level to draw a line straight up, from thecenterline on the template to the ceiling.• Measure 6-1/4" from the back wall to the centerlineof a 8-1/2" hole on the ceiling.Note: If drywall is not present, add drywall thicknessto the 6-1/4" dimension.Wall Ducting:If ductwork will vent to the rear:• Use the level to draw a line straight up from thecenterline on the template.• Measure at least 8" above the top mounting bracketholes shown on the template to the centerline of an8-1/2" dia. duct hole. (Hole may be elongated forduct elbow.)HOUSE WIRING LOCATION:• The junction box is located on the top of the hood,at the back right side.• Route house wiring as close to the ceiling locationas possible, through the ceiling, soffit or back wall.Wiring should enter at least 4" above the bracketon the right side.124Dia6124Dia1216"23"11"24"124Dia13