|
8Installation PreparationREMOVE THE PACKAGING• Remove packages from the “V” shaped cardboardsection. Remove shipping pads.• Lift the hood out of the box.IMPORTANT: Lift the hood by graspingthe outside edges of the exhaust opening on the top.• The vent hood motor is shipped secured to the skid with4 screws. Locate and remove 2 screws on each side of themotor. Discard the shipping skid and screws.• Grease filters must be removed. Grasp the latch, pullthe filter up and lift out.Hood PartsWoodMountingSupportMotorMountedon SkidShipping CartonDuctTransition• From the inside of the hood, loosen (do not remove)the 2 screws holding the wood mounting support tothe back of the hood. The screws should be backedout of the wood to 1/4". Remove and set aside themounting support with screws for later installation.DO NOT DISCARD.• Remove tape and packing material from the hood andall supplied parts.• Lift to remove the grease trays. Set grease filters andtrays aside for later installation. DO NOT DISCARD.TOOLS AND MATERIALS REQUIRED(NOT SUPPLIED)Pencil and tape measurePliersElectric or battery operated drilland 1/8", 3/8" bits120V 60Hz. 15 or 20 Amp,2-wire with ground. Properlygrounded branch circuit.Key Hole SawHammerWire cutter/stripperStep ladderMetal Snips Saber sawor SawsallWire nutsPhillips and flatbladescrewdrdiversStrain relief forjunction cover.Spirit level1/4" pivotinghex socketFlashlightSafety glasses10" round metalduct, length tosuit installation.Duct tape PreviousNext |