• The concrete block should be set on firm footings or on a floor capable ofcarrying the weight of the concrete block and capable of absorbing the freeforces and gas forces of the compressor during operation. The ground underthe concrete block should be horizontal and flat.• The top surface of the block should be level and even.• There should be sufficient free space around the block to install corkboard (orsimilar).• The block should be provided with anchor bolt recesses or holes according tothe anchor bolt spacing as per package lay out drawing.Fig.5A Chemical anchorB Grouted anchor, grounded to reinforcing steelIt is recommended to consult a concrete specialist/ constructor for the followingitems:• The compound of the concrete with/without reinforcement.• The exact grouting depth (dependent on the soil conditions).• Installing foundation onto an existing floor, with sealing corkboard or vibrationisolators.1.2.5.2 AnchoringAfter the concrete block has cured the anchors should be installed as shownabove and in case of a package in accordance with the package lay out drawing.Templates should be made to locate the anchor bolts or chemical anchors tomatch the holes in the bottom flange of the base frame.Grout the mortar according to the supplier instructions. Install chemical anchorsas illustrated in Figure 6, Page 18 and according to the instructions of theanchor supplier.INSTALLATION AND PREPARATION FOR USEINSTALLATION0089288gbr_1130.10.2017 17