21ENGLISH6 - START UP1 TANK LID2 TANK3 POWER CABLE4 ELECTRIC OUTLET5 MAIN SWITCH6 LEVEL CONTROL PLATE7 LIGHT FOR WATER LACK LEVEL IN TANK8 COFFEE SWITCH (WITH DISTRIBUTION ANDBOILER LOADING LIGHT)9 BOILER MANOMETER10 HOT WATER TAP11 HOT WATER PIPE12 VAPORIZER TAP13 VAPORIZER PIPE14 GROUP VACUUM UNIT15 BASIN16 FILTER HOLDER Fig.6.01- The self-level device will start at the same time as the relevantlight (Fig.6.01-pos.8), so that the water can reach the regularlevel in the boiler. Only during the first loading, this operationcan take quite a long time and make the machine stop; in thiscase switch off the machine and switch it on again by acting onthe main switch (Fig.6.01-pos.5).After completing the machine preparation, proceed to the start up.- By positioning the main switch (Fig.6.02) on I the switch lightwill turn on.ABFig.6.02Fig.6.03Warning !!When the machine is new the filter-holder sump may notbe aligned (perpendicular to the machine itself) as shownin the figure at the side, however this does not effect theefficient function of the same.After a short period of use the sump will gradually settleinto a correct position.A = Position of closed filter-holder with new machine.B = Position of closed filter holder with machine after a shortperiod of use.- Then wait until the machine reaches the operating pressure of“1,2 - 1,3 BAR” by checking the boiler pressure on themanometer (Fig.6.01-pos.9).- The machine is now ready for use.IMPORTANT: N°2 under-tile packings with are thinner(8.1mm ) than that fitted as standard are included. Thesepackings may be used in the event of difficulty with insertionof the filter holder.