3Installation toolsAccessories provided with the router• Power cord• Console cable• Ring terminalUser-supplied tools and equipment• Phillips screwdriver• Flat-blade screwdriver• Wire-stripping pliers, needle-nose pliers• Screws with various specifications• Meters and equipment such as HUB, terminal, and multimeter• ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags• Electric drill (for wall-mounting the router)• HammerPre-installation checklistTable 4 Pre-installation checklistItem Requirements Yes NoInstallationsiteVentilation• There is a minimum clearance of 10 cm (3.9 in) aroundthe router chassis intake and exhaust vents for heatdissipation.• The installation site ventilation system is adequate.Temperature 0°C to 40°C (32°F to 104°F)Relative humidity 5% to 90% (noncondensing)Cleanness Dust concentration ≤ 3 × 104 particles/m3ESD prevention• The equipment and floor are properly grounded.• The equipment room is dust-controlled.• Humidity and temperature are maintained at properlevels.• Wear an ESD-preventive wrist strap when inspecting orhandling a circuit board.EMI prevention• Take measures to protect the power system from thepower grid system.• Keep the protection ground of the router as far awayfrom the grounding device or lightning protectiongrounding device as possible.• Keep the router far away from radio transmitters, radar,and high-frequency or high-voltage devices.• Use electromagnetic shielding when necessary.