47IndexA C E G I L M N P R S T V WAAC and RPS power input failure,29AC power input failure,29Accessing the IRF fabric to verify theconfiguration,28Attaching the mounting brackets to the switch,5CChassis views,32Cleanliness,2Configuration terminal display problems,30Configuring basic IRF settings,27Connecting an AC power cord,17Connecting an RPS DC power cord,19Connecting the console cable,21Connecting the physical IRF ports,27Connecting the power cord,17Console port,40EEMI,2Examining the installation site,1GGarbled display,30Grounding the switch,14Grounding the switch by using the PE wire of the ACpower cord,17Grounding the switch with a grounding conductorburied in the earth ground,16Grounding the switch with a grounding strip,14IIdentifying physical IRF ports on the memberswitches,26Identifying the master switch and planning IRFmember IDs,24Installation flow,4Installation procedure,11Installation procedure,13Installation tools,3Installing a surge protected power strip,45IRF fabric setup flowchart,23LLaser safety,3LEDs,42MMagnet-mount kit,12Magnet-mounting the switch,12Mode LED,42Mounting brackets,5Mounting the switch in a rack,8NNo display,30PPlanning IRF fabric setup,24Planning IRF fabric size and the installation site,24Planning IRF topology and connections,25Planning the cabling scheme,26Ports,40Power status LED,42Power supply failure,29RRack-mounting the switch,4RPS power input failure,29RPS status LED,42SS5120-20P-SI,32S5120-28P-HPWR-SI,36S5120-28P-PWR-SI,35S5120-28P-SI,33S5120-52P-SI,33S5120-9P-HPWR-SI,35S5120-9P-PWR-SI,34S5120-9P-SI,32Safety recommendations,1Setting terminal parameters,22Setting up the configuration environment,21Starting the switch,22TTechnical specifications,37Temperature/humidity,1VVerifying the installation,20WWall anchor,10