Installation accessories 安装附件介绍Wear an ESD wrist strap, and make sure the wrist strap makes good skin contact and isreliably grounded. 操作者需佩戴防静电腕带,确保防静电腕带与皮肤良好接触,并确认防静电腕带已经良好接地。The installation tools are not provided with the switch. Prepare them yourself.交换机不随机提供安装工具,请用户根据实际安装需求自己准备安装工具。Phillips screwdriver十字螺丝刀ESD wrist strap防静电腕带Tool list 工具参考Grounding screw接地螺钉Mounting brackets挂耳Removable cable tie可拆卸式扎带Chassis rail and slide rail滑道和导轨M4 screwM4螺钉M6 screw and cage nut (user supplied)M6 螺钉和浮动螺母(用户自备)Power module filler panel电源假面板Installation positions for accessories 附件安装位置介绍To install the slide rails, chassis rails, and mounting brackets to the switch, you canchoose the installation positions for these accessories. 利用滑道、滑道导轨配合挂耳将交换机安装到19英寸机柜时,可以根据需要调整附件在交换机上的安装位置。The S6800-32Q provides a grounding sign at the primary grounding point, but does notprovide it at the auxiliary grounding point. S6800-32Q主接地点标有接地标识,备用接地点上无接地标识。The two grounding screws at the primary grounding point also apply to the auxiliarygrounding point.S6800-32Q主接地点上的两个接地螺钉同样适用于备用接地点。21H3C S6800-32Q Switch Installation Quick Start-6W106H3C S6800-32Q交换机 快速安装指南-6W106!Marker记号笔Grounding cable接地线!Mounting bracket installation position (two options) 挂耳安装位(二选一)Near the network ports安装在靠近端口侧Near the power modules安装在靠近电源侧Chassis rail installation position (two options) 滑道导轨安装位(二选一)Near the power modules靠近电源侧Near the network ports靠近端口侧Grounding cable installation position (two options) 接地线安装位(二选一)Primary grounding point(near the power modules)主接地点(靠近电源侧)Auxiliary grounding point(near the network ports)备用接地点(靠近端口侧)The switch provides three holes for installing mounting brackets near the network ports.端口侧的挂耳安装孔只有三个。!